SOCAR drilling departments drilled in the current January-July 78 871 meters, SOCAR told Trend. This is by 11,9% lower of the last year’s figure of the similar period.
In July departments drilled 12207 meters, which is by 5,1% more of the plan. Department of drilling and prospecting works “Bail Limani” drilled 1755 meters, "Gum Adasi” вЂ" 1630 meters, "Neft Dashlari” - 450 meters, "Рђbsheron” вЂ" 3000 meters, "Gobustan" - 3300 meters, Oil and Gas Producing Unit "Рђbsheronneft” вЂ" 282 meters, "Siazanneft вЂ" 750 meters, "Bulla-Deniz” - 185 m, the Department of topography and complex geologic prospecting (DTCGP) - 855 meters.
SOCAR drilling departments |
January-July 2005 (meters) |
% by January-July 2004 |
Bayil Limani |
11785 |
82,0 |
Gum Adasi |
12732 |
106,0 |
Neft Dashlari |
6750 |
86,5 |
Рђbsheron |
11422 |
105,5 |
Gobustan |
22046 |
86,3 |
Рђbsheronneft |
2282 |
36,0 |
Siazanneft |
5010 |
101,4 |
Bulla-Deniz |
2524 |
51,5 |
DTCGP |
4320 |
154,8 |