ChevronTexaco, led by Tengizchevroil which is involved in oil production in Kazakh field Tengiz, will pump approximately 75,000 barrels of oil a day via BTC, David Woodward, the President of BP Azerbaijan, stated to a news conference on 21 July, Trend reports.
According to Woodward, at present talks on oil pumping via BTC is being cared out with Tengizchevroil. A special agreement will be signed with Tengizchevroil on oil pumping via the Baku-Tbilisi-Ceyhan (BTC) pipeline, he said.
Tengiz oil can run via BTC in 2007 РіРѕРґСѓ.
Besides, Chevron possesses 8.9% -stake in BTC and 10.3% -stake in the project on Azeri-Chirag-Gunashli fields development. According to Chevron, the cost of BTC is $4.5bn.