Azerbaijan, Baku / Trend / In the first half year, Azerbaijan Thermal Power Station produced 5bln KWt electricity, an increase of 157bln KWt from the forecasted figures, a source state in Azerenergy JSC on 30 July. In June the Station produced 380mln KWt electricity, this is an increase of 13mln KWt from the forecasted figures. The Station comprising of eight energy blocks was put into operation in 1981.
Currently Azerenergy is considering the reconstruction of the Station. The credit for this will be allocated by the European Bank for Reconstruction and Development.