Azerbaijan, Baku / Trend corr. A.Badalova / 'Azerenerji' joint-stock company eliminated the shortcomings of capacity on energy block 6 by 55 megawatt, and on energy block 8 by 48 megawatt at the Azerbaijani thermoelectric power station. Old parts of the energy block were changed by new ones as a result of repair work. Presently, repair work is being held on energy block 2. Two steam tubes with 90m height are being set up on the steam tube 1 with 300m of height, as well as а the concrete cover of the water-distributing channel of Verkhni-Karabakh channel' is being reconstructed.