...

Natig Aliyev: First tanker with Azerbaijan oil to leave Ceyhan on 27 May 2006

Politics Materials 21 February 2006 16:19 (UTC +04:00)
Natig Aliyev: First tanker with Azerbaijan oil to leave Ceyhan on 27 May 2006

Azerbaijan plans to transport over 3 million tons of oil in 2006 against 4,1 million tons in 2005 through the Baku-Novorossiysk oil pipeline, the head of the Azerbaijan Ministry of Industry and Energy (MIE), Natig Aliyev said in a statement to journalists today, Trend reports.

Pumping of over 3 million tons of oil the MIE head explained by the fact, that the Baku-Tbilisi-Ceyhan (BTC) oil pipeline was scheduled to be commissioned and the maximal oil volumes were to be used for this route, however, for today the project is delaying. В"The oil pipeline commissioning has been scheduled already and in case no surprises happen the first tanker will leave on 27 May 2006, he was quoted as saying.

Latest

Latest