Improvement of water supply to the population of Azerbaijan and construction, upgrade and recovery of drainage system establish the basis for Azerbaijans economic development, reportedly said Nizameddin Rzayev, president of Azersu JSC.
As to operations in the republics capital, Rzayev said in 2005 JSC constructed a tank farm for drinking water with capacity 10k m3, installed a 3.2 km long main water pipeline and restored a 19.7km long drainage line.
Speaking of Bakus outskirts, Rzayev stated construction of a new 30km long water line between towns of Mardakana and Shuvelyana, which resulted in meeting local dwellers needs in drinking water.