Azerbaijan, Baku, 30 January / Trend / The State Oil Company of Azerbaijan (SOCAR) will construct the under water gas pipeline from the Guam Adasi offshore field to Nargin Island.
The length of the new gas pipeline is 7km. The pipeline will be weld on the construction area pf SOCAR in Hovsan.
SOCAR has completed the construction of under water pipeline from the coast to Nargin Island. The length of the water 10- inchlong pipeline is 17km. The Suleyman-Vazirov pipe-lay ship was used during construction of the gas pipeline.
Construction of new pipeline enable to provide the Island with gas and water.