Azerbaijan, Baku / / Trend / AMEC-Tekfen-Azfen (ATA) consortium has completed building the upper sections for the platform installed in the abyss part of the Gunashli field within the framework of the full-scale development of the Azeri-Chirag-Gunashli fields, AMEC reported. The upper constructions were sent to sea, where they will be installed on the bearing unit.
The upper constructions are directed to platforms for production, to finish squeezing off gas and water infusion using engineered technological systems.
The upper constructions weighing 12,007t will be installed on the bearing unit located at a 175m depth in the Caspian Sea 120km from the coast.
The building of the upper constructions was commenced in mid 2005.