...

Uzbekneftegaz JSC plans to drill new wells, put them into operation

Uzbekistan Materials 7 January 2022 15:27 (UTC +04:00)
Uzbekneftegaz JSC plans to drill new wells, put them into operation

BAKU, Azerbaijan, Jan.7

By Natavan Rzayeva - Trend:

Uzbekneftegaz JSC plans to drill and put into operation 24 new wells in the Ustyurt region of Uzbekistan in 2022, Trend reports referring to the press service of the company.

In 2021, 34 new wells were drilled and put into operation by the company.

Of these, 23 wells were drilled as part of the state program for increasing hydrocarbon production in 2017-2021, and 11 wells were drilled at the expense of Uzbekneftegaz JSC's own funds.

In particular, a highly productive inflow of natural gas was obtained from wells No. 14, 20, 22 at the Kuyi Surgil field and No. 96 at the Sharkiy Berdak field in 2021.

To date, production wells are being drilled on the territory of Ustyurt using 11 drilling rigs.

Of these, wells No. 63 at Sharkiy Berdak field and No. 21 at Kuyi Surgil field are still being drilled.

---

Follow the author on Twitter: @NatavanRzayeva5

Tags:
Latest

Latest