In Gum Deniz oil field of Azerbaijan, workovers in the GD716 & 038 continued in September 2021 with the GD430, GD372, and GD 479 wells completed and returned to oil production, Trend reports with reference to the US Greenfields Petroleum Company, which operates the project through its subsidiary BEOC.
The table below shows the work carried out at the field during the reporting period:
Field/Location |
Work Description |
Status |
Gum-Deniz,Causeways PLT2 |
Repair& reconstruction at PLT2Gum-Deniz to carry out WO jobs in the wells 351& 352. Completed hammering of 11ea piles out of 12" pipes. Connecting hammered piles üith existing metal sheets' 600& 400steel beams. Continue with welding and mounting of 4ea 12" pipes for rotary supports. |
in progress |
Gum-Deniz,Causeways |
Installation and connection of piles made of 10"pipes in front of PLT66, for the repairof bad parts of the ocauseway and the vehicle overpass. Completed hammering of 4piles and connection of 400mm double beams between the piles. Additionally, hammering of new piles on the east side of previously hammered piles. |
in progress |
Gum-Deniz,Causeways PLT9 |
Connection of 600mm i-beam with 10x10panels installed on the causways' piles for the widening of the vehicle pass at the causeway in between the crossroads and PLT9where 6/0.4kV Distribution Unit No. 13located. |
in progress |
Gum-Deniz, PLT2 |
Concerning WO of wells 203;297; 716; 504at PLT2, skidding and installation of the UPT-50pulling unit pedestal and the pipe racks |
in progress |
Gum-Deniz, Causeway, PLT209 |
Carrying out works on installation of 12th,13th 14th & 15th 8x10x0,4m & 10x10x0,6m sized metal panels at PLT209. |
in progress |
Gum-Deniz, Fab.shop |
Welding and setting up works in the Fab. shop on the cable spoolerused during WO operations (POOH& RIH) at ESP wells of Gum-Deniz field." |
in progress |
Gum-Deniz,Causeways |
Continuing welding gas lines and elbows on 2.5" gaslift line layed from PLT9to PLT450 |
in progress |
The Gum Deniz Oil Field is located south of the Absheron peninsula, 21 km south of Baku, between Gum Island and the Bahar Gas Field. The Gum Deniz Oil Field extends from onshore Gum Island, which is 2.5 km from the mainland to the south in the Caspian Sea. The Gum Deniz Oil Field is found along the Fatmai–Gum Adasi anticlinal trend which includes the Bahar and Shakh Deniz structures. Oil in the Gum Deniz Oil Field is trapped in a north-south trending structure that is approximately 16 kilometres in length and 3 kilometres in width. The Gum Deniz Oil Field is structurally up-dip from the Bahar Gas Field. The fields are separated by a structural saddle.
---