...

Over 70 settlements supplied with gas since early 2018 in Azerbaijan

Oil&Gas Materials 9 October 2018 11:32 (UTC +04:00)

Baku, Azerbaijan, Oct. 9

Trend:

During January-September 2018, Azerigaz laid 2385.1 kilometers of new gas pipelines, and for the safe operation of the gas pipeline network overhauled 182.6 km of the existing lines, Azerigaz said in a message on Oct. 09.

As a result of the construction and assembling work, during January-September 2018, 71 settlements have been provided with gas in Agstafa, Agjabadi, Agsu, Ismayilli, Barda, Gakh, Guba, Shabran, Shamakhi, Shaki, Goychay, Goygol, Ujar, Khachmaz, Beylagan, Yevlakh, Lerik, Lankaran, Sabirabad, Saatli, Salyan, Neftchala, Jalilabad and Masalli districts.

Tags:
Latest

Latest