...

Gas purification installation repaired at Shurtan gas chemical complex in Uzbekistan

Oil&Gas Materials 7 November 2020 17:29 (UTC +04:00)
Gas purification installation repaired at Shurtan gas chemical complex in Uzbekistan

BAKU, Azerbaijan, Nov. 7

By Klavdiya Romakayeva - Trend:

A scheduled overhaul of the first stage of the gas purification unit from sulfur was carried out at the Shurtan Oil and Gas Production Department, Trend reports referring to the press service of Uzbekneftegaz.

The first stage of the unit was launched in 1985. Its function is to remove sulfur and carbon dioxide from the exhaust gases from the device. It is designed to receive 0.8 billion cubic meters of regeneration gas annually.

The operating modes of the units of the main facility were optimized in order to prevent a reduction in refining volumes during the period of suspension of the repair of the first stage of the gas purification unit from sulfur using amine. As a result, a reduction in the total volume of gas for processing by 1,600 cubic meters per day was prevented.

The stable operation of the main facility was ensured in the autumn-winter period as a result of the repair of the unit, and the quality of gas supplied to the main gas pipelines of the Mubarek management of Uztransgaz JSC was raised to the level of O'zDSt-948:2016.

The planned repair of the first stage of the installation was successfully completed and backed up despite the quarantine conditions of the coronavirus pandemic, with strict adherence to measures to prevent the spread of the virus in the department.

---

Follow the author on Twitter: @romakayeva

Tags:
Latest

Latest