SOCAR’s drilling units drilled about 115,000m

Oil&Gas Materials 11 November 2005 18:04 (UTC +04:00)

SOCAR drilling units have drilled in the current January-October 114 885 meters, SOCAR told Trend. This is by 10.5% lower of the last year’s figure of the similar period.

In October the units drilled 11143 meters, which is 1801 meters more of than August. Bail Limani unit drilled 2850 meters, "Gum Adasi” вЂ" 1702 meters, "Neft Dashlari” - 1147 meters, "Рђbsheron” вЂ" 1500 meters, "Gobustan" - 3227 meters, Oil and Gas Producing Unit "Рђbsheronneft” вЂ" 149 meters, "Siazanneft вЂ" 360 meters, "Bulla-Deniz” - 207 m, the Department of topography and complex geologic prospecting (DTCGP) - 4751 meters.

The comparative table on drilling production in January to October is as follows:

SOCAR drilling units

Jan-Oct 2005 (in meters)

% of 2004

Bayil Limani

19695

95,8

Gum

Adasi

17750

101,6

Neft Dashlari

11412

96,7

Рђbsheron

18062

108,2

Gobustan

29700

84,8

Рђbsheronneft

2755

33,2

Siazanneft

6960

104,1

Bulla-Deniz

3800

63,9

DTCGP

4751

92,1