Two pump rigs of the Baku-Tbilisi-Ceyhan main export oil pipeline will be put into exploitation in the nearest 3 months, Trend reports quoting Hilmi Guler, the Turkish Minister for Energy and Natural Resources, as saying to the Turkish media.
The Minister reminded that the oil pipeline was equipped with 4 big pump rigs, of which two are in the territory of Turkey. Guler said that, “today there is no problem in the oil pipeline.”