...

Uzbekneftegaz develops new well, receives natural gas

Oil&Gas Materials 16 September 2021 12:57 (UTC +04:00)
Uzbekneftegaz develops new well, receives natural gas

BAKU, Azerbaijan, Sept. 16

By Fakhri Vakilov – Trend:

Uzbekneftegaz has completed drilling work on well No. 64 of the Kulbeshkak field of the Gazli oil and gas production department, and perforation work has been carried out in the intervals of 1904-1901 m, 1899-1895 m, 1893-1885 m, Trend reports referring to Uzbekneftegaz.

Uzbeknefteqaz is carrying out large-scale work to increase production of natural gas at the fields.

According to operational data, after the well was completed, an industrial gas flow was obtained with a daily flow rate of 80,000 cubic meters and 1 ton of gas condensate.

Currently, work is underway to equip the well and connect to a gas collector.

The Kulbeshkak gas condensate field is located in the Karakul district of the Bukhara region and was commissioned in 2008.

---

Follow author on Twitter:@vakilovfaxri

Tags:
Latest

Latest