...

Kazakh energy minister talks about operation capacity of CPC terminal

Oil&Gas Materials 6 April 2022 17:07 (UTC +04:00)
Kazakh energy minister talks about operation capacity of CPC terminal
Nargiz Sadikhova
Nargiz Sadikhova
Read more

BAKU, Azerbaijan, April 6. Only one berth is operational at the marine terminal of the Caspian Pipeline Consortium (CPC), so the shipping is carried out at 60-percent capacity of the terminal, Kazakh Energy Minister Bulat Aqchulaqov said, Trend reports citing Kazakh media.

The minister also spoke about the berth that is currently on repair.

"There's a strong storm, and the divers can't work underwater in such conditions. To carry on with the repairs, a separate brigade is needed," he said.

“Repairs at the terminal would have practically no effect on oil production in Kazakhstan if they are completed before mid-April. There will be losses if the repairs last for a month," he said.

There is no political reason behind the shutdown of the CPC marine terminal for repairs, all issues are technical, Aqchulaqov said.

Tags:
Latest

Latest