...

AZERIGASNAGL REPAIRS GAS PIPLINE �YEVLAKH-BALAKAN’

Oil&Gas Materials 20 July 2005 20:00 (UTC +04:00)

Azerigasnagl production association (PA) determined the winner of the tender on overhaul repair of 3,855 km gas line �Yevlakh-Balakan’, Trend reports.

The Agdam Construction-Assemble Unit No2 will repair the gas pipeline in 50 days. 10-13 km, 22-23 km, 35-35.5 km, 36-39 km sections of the gas pipeline are planned to be repaired.

Latest

Latest