BAKU, Azerbaijan, Sept. 24
By Fakhri Vakilov – Trend:
Uzbekneftegaz has completed drilling at well No. 227 of the Alan field of the Mubarek Oil and Gas Production Department, Trend reports referring to Uzbekneftegaz.
An industrial gas flow was obtained with a daily flow rate of 60,000 cubic meters and 1 ton of gas condensate.
On behalf of the Chairman of the Management Board of JSC "Uzbekneftegaz" Mehriddin Abdullayev, large-scale work is being carried out to increase the production of natural gas at the fields of Uzbekistan.
In particular, along with the overhaul of wells, drilling of new wells, repair and commissioning of abandoned wells in the complex is being carried out.
The Alan gas condensate field is located in the Kashkadarya region of the and has been developed since 1979.
---
Follow author on Twitter:@vakilovfaxri