Baku, Azerbaijan, July 10
By Nargiz Sadikhova - Trend:
The construction of a poultry complex in Kazakhstan’s Mangystau region is half finished, Trend reports with reference to LS news agency.
The construction commenced in 2016. Currently, over half of the complex’s objects have been built. The put into operation of the complex is planned before the end of 2019.
The cost of the construction is estimated to equal to three billion tenge. The capacity of the poultry farm is to be 5,000 tons of manufactured product a year.
It is planned that 100% percent of the manufactured product will be sold within the internal market of Kazakhstan.
(1 USD = 384.91 KTZ on July 10)
---
Follow the author on twitter: @nargiz_sadikh