Azerbaijan, Lenkoran, August 10 / Trend P. Aliyeva /
Heavy wind and rain began in Azerbaijani south regions on August 9 caused problems with energy supply and communication in several regions.
At present, there is lack of electric power supply in 40 percent of houses and 50 percent of villages. Electric power was switched off on lines 6, 4, 9 and 5 to prevent accidents. Several electric lines were broken as a result of trees fall, deputy head of executive power of Lenkoran, Mohabbat Babayev told Trend .
Roughly 30 percent of houses are short of electric power in Lerik region, executive power of Lerik region told Trend .
At present, emergency brigades operate to remove problems caused by nature. Damage is calculated.