...

Modernization of primary gas treatment unit carried out at Uzbek oil field

Oil&Gas Materials 27 November 2020 16:27 (UTC +04:00)
Modernization of primary gas treatment unit carried out at Uzbek oil field

BAKU, Azerbaijan, Nov. 27

By Klavdiya Romakayeva - Trend:

A modern measuring device was installed on the primary gas treatment device at the Yangikazgan field in Uzbekistan, Trend reports referring to the press service of Uzbekneftegaz JSC.

The Gazli oil and gas production department at the primary gas treatment facility at the Yangikazgan field has been modernized for the required preparation and digitalization of gas quality.

As a result, a modern measuring device was installed on the device for the development of the digital economy, and the remote control was carried out.

The measuring device was provided with a separator, a degasser (a device used in drilling to remove gasses from drilling fluid), ventilation, detachable equipment, and locking zulfines, based on the internal capabilities of the departments of Uzbekneftegaz JSC.

Construction and installation works have been successfully completed and put into operation by the team of Oil and Gas Pipeline Construction & Repair.

The Yangikazgan field was commissioned in 1967, and the work is underway on three existing separators to separate formation fluids and mechanical joints.

The national holding company Uzbekneftegaz is a state-owned holding company and the largest state company in Uzbekistan. The company ranks 11th in the world's natural gas production.

---

Follow the author on Twitter: @romakayeva

Tags:
Latest

Latest