...

Р’Р  Azerbaijan Completed Perforation of Second Well on an Azerbaijani Gas Condensate Field

Oil&Gas Materials 17 February 2007 13:52 (UTC +04:00)

Р'Р  Azerbaijan has completed the perforation of the second pre-drilling well on an Azerbaijani gas condensate field, Shah-Daniz. The well is expected to be put into operation at the end of February, 2007, a source in SOCAR told Trend.

Then the third and the fourth ones will be put into operation as well.

After the three wells are put into use, Р'Р  Azerbaijan will resume works on the fisrt one. The Companyis currently solving troubles and irreguliarities occured on the fisrt pre-driling well and simulataneously linking the second one with the platform. Notably, the fisrt pre-drilling weel was interrupted due to a gas escape occured in it.

Latest

Latest