BAKU, Azerbaijan, Sept. 20
By Fakhri Vakilov – Trend:
Uzbekistan's Asia Trans Gas JV LLC has announced a tender for the reconstruction of sewage treatment plants at the facilities of the Bukhara Department of the Main Gas Pipeline Management, as part of the project for the construction and operation of the Uzbekistan-China main gas pipeline.
Proposals are accepted until October 24, 2021.
The bidder must perform the following work:
- Replace all piping (steel) lines with new polymer-based pipes.
- Replace the worn out pumps with new ones of the same capacity.
- Replace worn float gauges with new ones.
- Replace the metal mesh at the inlet of the sludge collector.
- Install new filtering elements with a total capacity of at least 2m3/hour.
- Carry out adjustments in the automation system to improve the performance of the biological process and the degree of purification.
- Carry out anti-corrosion coating of sections to extend their service life.
Contact: Abduvahid Abdukhakimov
Tel: + 99894-6602348
E-mail: [email protected]
---
Follow author on Twitter:@vakilovfaxri