BAKU, Azerbaijan, July 11
Trend:
The industrial flow of gas reached 1 million cubic meters per day on July 9, 2021 during the test of prospecting well #9 of Aizovat field in Uzbekistan’s Kashkadarya region, Trend reports with reference to the Uzbek media.
The drilling process to the design depth will be completed till July 15, 2021, after which the well will be connected to the gas transportation system to transport gas to the population of the country.
All work is carried out in accordance with the sanitary-epidemiological and environmental standards.