...

Azerbaijani ministry to allocate funds to prepare feasibility study for reservoir construction

Business Materials 23 June 2021 16:03 (UTC +04:00)
Azerbaijani ministry to allocate funds to prepare feasibility study for reservoir construction

BAKU, Azerbaijan, June 23

Trend:

The Azerbaijani Ministry of Ecology and Natural Resources and the Hydrotrans Engineering Center for the Design of Water and Transport Infrastructure LLC signed a contract worth 955,000 manat ($561,764), Trend reports on June 23 with reference to the "Electronic Procurement" website.

The winner of the tender announced by the ministry for the preparation of a feasibility study and design estimates within the second stage of the construction of the Vilyashchay reservoir has been named.

"The Hydrotrans Engineering Center for the Design of Water and Transport Infrastructure LLC was named as the winner of the tender upon the decision of the tender commission,” the message said. “A contract worth over 955,000 manat ($561,764) was signed with the company."

---

Follow the author on Twitter: @Fidan_Babaeva

Tags:
Latest

Latest