BAKU, Azerbaijan, Nov. 19
By Natavan Rzayeva - Trend:
Uzbekneftegaz JSC has successfully completed an overhaul at well No.1-K of the South Kemachi field (country's Karaulbazar region), Trend reports citing the press service of the company.
As a result of the work carried out in the intervals of 2230- 2221 and 2218-2211 meters, an industrial gas flow of 50,000 cubic meters and 1.4 tons of gas condensate per day was obtained.
The South Kemachi gas condensate field is located in the Karaulbazar region of the Republic of Uzbekistan and was commissioned in 1979.
Previously, Uzbekneftegaz JSC has successfully completed drilling at well No.323 of the Zevarda field in the Kashkadarya region. As a result of the work carried out in the intervals of 2800- 2667 meters, an industrial gas flow of 100,000 cubic meters and 1 ton of gas condensate per day was obtained.