BAKU, Azerbaijan, November 14. Uzbekneftegaz JSC completed repair at well No.53 of the Kulbeshkak field (country’s Bukhara region), Trend reports via the company's statement.
As a result of the work carried out, an industrial gas flow of 70,000 cubic meters of gas and 0.7 ton of gas condensate per day was obtained.
The Kulbeshkak field is located in the Karakol district of the Bukhara region and has been in operation since 2008.
Previously, Uzbekneftegaz JSC completed drilling at well No.68 of the Kulbeshkak field (country’s Bukhara region).
As a result of the work carried out, an industrial gas flow of 70,000 cubic meters of gas and 1 ton of gas condensate per day was obtained.
---
Follow the author on Twitter: @NatavanRzayeva5