Kazakh KazTransOil reduces oil transshipment

Oil&Gas Materials 25 January 2016 19:54 (UTC +04:00)

Baku, Azerbaijan, Jan. 25

By Elena Kosolapova - Trend:

"KazTransOil" JSC group of companies transported 61.001 million tons of oil and oil products in January-December 2015, that is 1. 806 million tons more than the planned index and 3.003 million tons less than the similar index of 2014, the company said.

The volume of oil transportation and transshipment separately through KazTransOil's main pipelines in January - December 2015 equaled to 47.541 million tons.

As compared to the planned index, the volume of oil transportation increased by 1.310 million tons, while comparing to the similar index of the last year reduced by 2.492 million tons.

Some 14.396 million tons of oil were delivered to the oil refineries of the Republic of Kazakhstan through the main pipelines of KazTransOil (297,000 tons less than the plan and 668,000 tons less than in 2014).

Some 4.767 million tons were delivered to Atyrau oil refinery (56,000 tons less than the plan and 22,000 tons less than in 2014).

Some 4.449 million tons were delivered to the Shymkent refinery (14,000 tons less than the plan and 341,000 tons less than in 2014).

The deliveries to the bitumen plant made up 373,000 tons (202,000 tons less than the plan and 249,000 tons less than in 2014).

Some 4.805 million tons were delivered to the Pavlodar plant (26,000 tons less than the plan and 56,000 tons less than in 2014).

The volume of oil transportation through the "Atyrau - Samara" section of "Uzen - Atyrau - Samara" main oil pipeline equaled to 15.702 million tons of oil (that is for 1.198 million tons more than planned and 1.061 million tons more than in 2014).

The volume of oil transshipment via "Atasu - Alashankou" oil pipelines amounted to 11.794 million tons (371,000 tons more than the plan, but 30,000 tons less than in 2014).

Oil loading in oil tanks of Aktau port, using the capacities of KazTransOil equaled to 2.881 million tons (191,000 tons more than the plan, but 2.314 million tons less than in 2014).

The volume of oil transshipment to CPC-K made 2.779 million tons (202,000 tons less than the plan and 169,000 tons less than in 2014).

Oil transportation volume via the section of TON-2 pipeline located at the territory of the Republic of Kazakhstan comprised 6.969 million tons (that is 62,000 tons more than the plan and 186,000 tons more than in 2014).

The volume of oil transportation through the "Kazakhstan-China Pipeline" pipeline comprised 15.870 million tons (269,000 tons more than the plan and 277,000 tons less than in 2014).

The volume of oil transportation through the "MunaiTas" pipeline equaled to 3.744 million tons (186,000 tons more than the plan and 718,000 tons more than in 2014).

Oil and oil products transshipment volume by Batumi Terminals Limited (BTL) made 3.616 million tons (266,000 tons more the plan, but 739,000 tons less than in 2014).