#Absheron field
-
JOCAP completes offshore installation of Absheron EPS modules (PHOTO)
-
"Azerbaijan" crane ship deployed for Absheron field dev’t
-
JOCAP completely surveys subsea umbilical for Absheron project
-
Full field development of Absheron offshore block is under study - JOCAP (PHOTO)
-
French TotalEnergies considering future expansion of EPS platform at Absheron gas field (Exclusive)
-
Last equipment delivered to Baku Deep Water Jacket yard for Absheron field – JOCAP
-
French TotalEnergies considering future expansion of EPS platform at Absheron gas field (Exclusive)
-
JOCAP talks progress of Absheron project in 2021
-
JOCAP updates on fabrication of topside modules for Absheron gas field
-
JOCAP announces planned works for Absheron project
-
JOCAP details plans for platform around Oil Rocks
-
Azerbaijan’s perspective oil & gas structures: even brighter future on horizon
-
SOCAR reveals Umid field’s gas output volume
-
Absheron EPS progress: pipe laying in Oil Rocks vicinity kicks off – JOCAP
-
P&O Maritime Logistics details on work at Shah Deniz, Absheron, Karabagh fields
-
Saipem announces timeframe for pipelines, umbilical systems installation at Absheron field
-
JOCAP updates on ongoing works at Absheron gas field
-
Saipem: Installation for Absheron project postponed to Q3 2020
-
Jackets for Azerbaijani Absheron field ready - BOS Shelf
-
Total company to continue projects in Azerbaijan
-
Azerbaijani Energy Minister talks role of co-op with France
-
SOCAR talks its activity results of 2019 as part of Absheron project
-
Update on gas extraction at Azerbaijan's Absheron field made public
-
Heydar Aliyev rig demobilized from Absheron field