...

Ceyhan oil terminal loads 1,400 oil tankers

Oil&Gas Materials 13 January 2011 13:35 (UTC +04:00)

Azerbaijan, Baku, Jan. 13 / Trend E.Ismayilov /

As of Jan. 13, 2010, Botas International Limited (BIL) has loaded 1,400 tankers with oil pumped via BTC from Ceyhan oil terminal since June 2006, BIL said.

BIL was first set up by Turkish State Pipeline Company Botas to establish cooperation with foreign companies. In 2001, BIL was reorganized to exploit BTC pipeline.

During the report period, the port shipped 1.097 billion barrels of oil as of Jan. 13.

BТС's total length is 1.768 kilometers including a 443-kilometer section running via Azerbaijan, a 249-kilometer section passing via Georgia and a 1,076-kilometer section traversing Turkey. Construction of the pipeline began in April 2003. The pipeline launched May 18, 2005.

BTC shareholders include BP (30.1 percent); AzBTC (25 percent); Chevron (8.90 percent); Statoil (8.71 percent); ТРАО (6.53 percent); Eni (5 percent); Total (5 percent); Itochu (3.40 percent); Inpex (2.50 percent); ConocoPhillips (2.50 percent) and Amerada Hess (2.36 percent).

Tags:
Latest

Latest