BAKU, Azerbaijan, January 5. Uzbekneftegaz JSC has completed drilling at well No.97 of the Sharkiy Berdak field, Trend reports citing the press service of the company.
As a result, an industrial gas flow of 70,000 cubic meters of gas and 1 ton of gas condensate per day was obtained.
Perforation was carried out in the range of 2442-2434 meters, 2359-2354 meters, and 2346-2342 meters.
The Sharkiy Berdak gas condensate field is located on the territory of the Muynak region of the Republic of Karakalpakstan and was put into operation in 2002.